GLM-5.3 vs Gemini 4 Hydrogen: cost

GLM-5.3: ✓ verified 2026-11-19 · Official pricing ↗
Gemini 4 Hydrogen: ✓ verified 2026-11-19 · Official pricing ↗
Synced 2026-11-19 01:00 UTC · Method

For a typical support chatbot, GLM-5.3 is about 1.8× cheaper than Gemini 4 Hydrogen ($393 vs $720 per month). Price is only one factor: test both on your own prompts before switching.

Monthly cost by workload

Estimated monthly cost by workload (USD)
Scenario (per month)GLM-5.3Gemini 4 Hydrogen
Customer support chatbot
5,000 req/day · 1,200 in · 400 out · cache 60%
$393$720
RAG over documents
2,000 req/day · 8,000 in · 600 out · cache 30%
$666$785
Coding agent
1,500 req/day · 25,000 in · 2,000 out · cache 80%
$945$1,080
Deep reasoning
800 req/day · 3,000 in · 6,000 out · cache 20%
$718$1,188
Batch processing
50,000 req/day · 1,500 in · 150 out · batch
$4,140$2,531
GLM-5.3 vs Gemini 4 Hydrogen: prices and limits
FieldGLM-5.3Gemini 4 Hydrogen
Input /1M$1.40$1.50
Output /1M$4.40$7.50
Cached /1M$0.26$0.075
Batch input /1M—$0.75
Batch output /1M—$3.75
Context window1,000,0001,048,576
Max input1,000,0001,048,576
Max output128,0001,048,576

Where the prices differ

Which one to pick

Pick GLM-5.3 when cost per request dominates: high-volume chatbots, classification, extraction, or anything you can run through a Batch API. Gemini 4 Hydrogen costs more but offers a larger context window (1,048,576 tokens), a longer maximum output (1,048,576 tokens), image input, a batch discount, a newer release (2026-11-12); choose it when that outweighs the price, and test both on your real prompts before committing.

Add a third model or change the workload in the compare tool, or open the model pages: GLM-5.3, Gemini 4 Hydrogen.

FAQ

Which is cheaper, GLM-5.3 or Gemini 4 Hydrogen?

GLM-5.3. For the support-chatbot scenario it costs $393 per month against $720 for Gemini 4 Hydrogen, about 1.83× less; on input tokens the gap is 1.07× and on output 1.7×.

What do 1M output tokens cost on GLM-5.3 and Gemini 4 Hydrogen?

GLM-5.3: $4.40 per 1M output tokens ($1.40 input). Gemini 4 Hydrogen: $7.50 per 1M output ($1.50 input). Prices are checked every 4 hours; see each model page for cache, batch and long-context rates.

Which has the larger context window?

Gemini 4 Hydrogen, with 1,048,576 tokens against 1,000,000 for GLM-5.3. Prompts near the limit cost more in absolute terms, so check the long-context rates on the model pages.